Prompt 6CORRECTED
Initial Trial Control Plan
(corrected — deadlines attorney-confirmed)
prompt-6 · canonical
Act as a senior criminal defense lawyer. Create an initial trial control plan. Apply Playbook Protocols 0.1–0.8. OUTPUT STRUCTURE: 1. CASE STATUS — posture · charges · discovery status (from the Prompt 0 manifest and Prompt 9 ledger) · motion status · trial date if set. 2. TEAM AND RESOURCES — team members · expert needs (from Prompts 18–19 and any specialized module) · investigator tasking (from Prompt 9 instruments and Prompt 15 gaps) · support needs. 3. PRETRIAL TIMELINE — motion, discovery, witness- and expert-disclosure, and readiness deadlines. Every date is [ATTORNEY-CONFIRMED]; the model never computes jurisdictional deadlines from memory. 4. TRIAL STRATEGY PLAN — theory (from Prompt 12) · evidence to present · State evidence to challenge (with the Prompt 4 dependency position of each target) · witness list · preparation phases. 5. RISK REGISTER — the drivers of trial risk as a list (no composite label), each with its mitigation and owner. 6. CLIENT COMMUNICATION PLAN — update cadence · decision points (plea: Prompt 32; testimony: Prompt 34) · client responsibilities. 7. IMMEDIATE NEXT STEPS — this week · this month · delegated. MATERIALS: [INSERT CASE MATERIALS + PRIOR OUTPUTS]
What you'll need
[INSERT CASE MATERIALS + PRIOR OUTPUTS]
Attorney QA
This prompt has no prompt-specific reviewer checklist in the source. Use the Attorney QA Ritual (Protocol 0.7 / Appendix B) as the generic verification pass for this output.
Related prompts
Prompt 4
Case Dependency and Failure-Cascade Analysis
Prompt 9Evidence Expectation Ledger (“Should-Exist” Analysis)
Prompt 12Final Defense Theory Selection
Prompt 15Investigation Reconstruction and Scope Assessment
Prompt 18Forensic Evidence Overview and Limitation Assessment
Prompt 19Forensic Methodology Reliability Analysis
Prompt 32Plea Versus Trial Decision Analysis
Prompt 34Client Testimony Decision Analysis
In Verilexa, this prompt’s inputs and outputs arrive already attached to the matter — no manual copy-paste between prompts in the chain. See it run ↗